Question from: County Councillor Gareth E Jones Subject: Follow up question re Backlog of School Maintenance
Question:
Thank you for your response to my question of the 19th August in relation to the backlog of School maintenance costs.
In your response you have stated that the three attached pdf files give the estimated backlog maintenance costs for each Primary, Secondary and Special Schools and the PRU’s. On examination of the figures, I see that there are 29 Schools with no figure of backlog maintenance identified for them.
I recognise that 16 of the 29 Schools are the new Schools built under the 21st Century Schools programme since 2012 with the remaining 13 Schools mainly being other schools replaced or remodelled in the preceding 30 years to 2012.
It is my belief that all schools, that are more than a year old will have some maintenance requirements and these figures, however small, should have been included in your initial response to allow members to have the full picture.
Can I request the following information: - 1. For each of the 16 Schools built under the 21st Century Schools programme: - a. The Gross Internal Floor Area of the School (Sq m) b. The estimated budget requirement per Sq m per annum to maintain these schools as Condition A. 2. For each of the following schools the estimated backlog maintenance figure and if this is not available an estimated backlog figure for the school calculated on the same / similar basis to the above. a. Ysgol Penmaes b. Builth Wells CP c. Caersws CP d. Crossgates CP e. Cefnllys CP (Llandrindod Wells) f. Llanfaes CP School g. Llanrhaerdr Ym Mochnant CP h. Newbridge-on-Wye C in W i. Priory C in W (A) j. Ysgol Dyffryn Trannon k. Llanbrynmair C P l. Ysgol Rhiw Bechan m. Ysgol y Bannau
Minutes: Response by the Cabinet Member:
For ease of reference your questions are repeated. Apologies for the delay in responding.
1. For each of the 16 Schools built under the 21st Century Schools programme: - a. The Gross Internal Floor Area of the School (Sq. m)
b. The estimated budget requirement per Sq. m per annum to maintain these schools as Condition A.
Table 1 – responds to 1a. and 1b. above.
The backlog of maintenance is subject to a programme of building and external infrastructure surveys which are on-going in a five-year rolling programme for each school site listed above.
2. For each of the following schools the estimated backlog maintenance figure and if this is not available an estimated backlog figure for the school calculated on the same / similar basis to the above. a. Ysgol Penmaes b. Builth Wells CP c. Caersws CP d. Crossgates CP e. Cefnllys CP (Llandrindod Wells) f. Llanfaes CP School g. Llanrhaerdr Ym Mochnant CP h. Newbridge-on-Wye C in W i. Priory C in W (A) j. Ysgol Dyffryn Trannon k. Llanbrynmair C P l. Ysgol Rhiw Bechan m. Ysgol y Bannau
Table 2.
|